Cable production process, step by step

Knowing the steps tells you where a construction can go wrong and what to ask for on the spec sheet. This page follows a power cable and a loose tube fibre cable through partner plant lines.

Request a quote

Cable production process line with stranding machine and extruder feeding XLPE insulated cable onto a take-up drum

Power cable: eight steps

A 0.6/1 kV or medium voltage power cable passes through the same core sequence in every cluster. The plant layout differs, and some steps are bought in, but the order does not change. The table maps each step to the check the desk asks for.

Power cable process steps and checks
StepWhat happensCheck that belongs to it
1. DrawingCopper or aluminium rod is drawn down to wire and annealedWire diameter, annealing, incoming rod records
2. StrandingWires are stranded and often compacted into a Class 2 conductor; Class 5 for flexible cableNumber of wires, conductor diameter, DC resistance to IEC 60228
3. Insulation extrusion and cross-linkingPVC or XLPE is extruded over the conductor; XLPE is cross-linked by silane curing or a continuous vulcanisation lineInsulation thickness, eccentricity, spark test, hot set for XLPE
4. CablingCores are laid up with fillers and binder tape; MV cores get screens firstLay length, core identification, roundness
5. ArmouringSteel tape, steel wire or aluminium wire armour over an inner sheathArmour coverage and wire count, armour resistance
6. SheathingPVC, LSZH or PE outer sheath is extrudedSheath thickness, overall diameter, surface
7. MarkingInk-jet or embossed sheath print and metre marksPrint text against spec sheet, metre mark accuracy
8. TestingRoutine tests per drum, sample tests per batchResistance, voltage, partial discharge for MV

Conductor and insulation: where most of the cost sits

Drawing and stranding set the conductor, and conductor resistance is the single most useful figure on a test sheet: for copper Class 2, IEC 60228 limits 25 mm2 to 0.727 ohm/km and 95 mm2 to 0.193 ohm/km at 20 C. Insulation extrusion sets thickness and concentricity. XLPE must be cross-linked to reach its 90 C continuous and 250 C short-circuit ratings; small LV sizes are often silane-cured, while MV cable runs on a continuous vulcanisation line with conductor screen, insulation and insulation screen applied in one triple extrusion head. That triple head is why MV cable cannot be made on an LV plant's line. See insulation and sheaths and MV power cables.

Cabling, armour and sheath

Cabling lays the cores together with fillers into a round shape. For armoured cable, an inner sheath goes on first, then steel tape (STA), steel wire (SWA) for multicore or aluminium wire (AWA) for AC single core, and finally the outer sheath. Each extra layer adds a line pass, which is one reason armoured and MV cable take longer to schedule. Sheath compound decides fire and smoke behaviour, so LSZH or flame-retardant PVC is fixed on the spec sheet and backed by a report on the finished cable.

Marking and testing

Marking is applied on the sheathing line or a separate printing pass: brand or private label text, construction, standard, year and metre marks. A miscounted metre mark becomes a short drum on site, so the desk checks calibration. Routine tests follow on every drum: conductor resistance, voltage test (for MV, 3.5 U0 for 5 minutes under IEC 60502-2) and partial discharge to IEC 60885-3 for MV. Sample tests such as thickness, hot set and diameter run per batch. The detail is on quality control.

Fibre cable: colouring, tubing, stranding, sheathing

Optical cable plants start from drawn and coated fibre, either their own or bought from a fibre maker, and add the protection around it.

  1. Colouring: each fibre receives a UV-cured colour to the TIA-598 sequence or the buyer's code, taking a 242 um coated fibre to about 250 um.
  2. Tubing: fibres are fed into a loose tube with gel, or tight-buffered to 0.9 mm for indoor cable; excess fibre length in the tube is controlled here.
  3. Stranding: tubes and fillers are stranded around a central steel wire or FRP member, with water-blocking materials.
  4. Sheathing: armour tape such as PSP or APL where specified, then PE or LSZH sheath, with print and metre marks; aramid yarn for ADSS and indoor cable.

After sheathing, each drum is measured by OTDR for attenuation and length. Attenuation is reported against the datasheet values for the fibre type; for G.652.D, the cabled fibre limits in the G.652 tables are 0.4 dB/km at 1310 nm and 0.3 dB/km at 1550 nm.

What this means for your order

Lead time follows the slowest step: copper booking and line slots for power cable, fibre and tube scheduling for optical cable, plus routine tests and drum supply. The desk confirms each in writing; see MOQ and lead time or start with the quote form.

Questions buyers ask

Q01Why does MV cable need a different line?

MV cable needs conductor screen, XLPE insulation and insulation screen applied together in a triple extrusion head and cured on a continuous vulcanisation line, plus a screened room for partial discharge tests. LV lines do not have these.

Q02What is the difference between silane and CV cross-linking?

Both cross-link XLPE. Silane curing happens after extrusion, often in hot water or steam, and suits LV sizes. Continuous vulcanisation cures the insulation on the line under heat and pressure and is used for MV cable.

Q03Does the plant make its own optical fibre?

Some plants draw their own fibre; many buy coated fibre from a fibre maker and do colouring, tubing, stranding and sheathing. The desk records which, and asks for the fibre datasheet behind the cable.

Q04Which step most often causes problems?

Conductor and insulation. Too little copper or thin insulation saves cost and is hard to see. Resistance per drum and thickness measurement on a cut sample catch both.

RFQSend the construction or standard you need, cross-sections, total metres and drum lengths, the reports your market asks for and the destination port. The desk replies in writing with matched factories, a spec sheet and the reference MOQ.