Skip to content
A FULVERA sourcing brand WhatsApp +86 155-5551-5351
Language: ENEnglish
  1. Home
  2. Industry clusters
  3. Packaging and drums

OP8

Cable drums and packaging

The drum is part of the cable order: it decides how long each run can be, how the cable survives the voyage and how easily a site crew can pull it. The desk fixes drum type, length per drum and protection in a written drum plan; see cable drum basics for the terms.

Request a quote

Wooden cable drums with lagging boards and steel-wood drums stacked in a yard ready for container loading

Why packing is a specification, not an afterthought

Cable is sold by length but shipped by weight and volume. A drum that is too small forces joints on site; a drum that is too heavy cannot be lifted by the crane the contractor has booked; an unprotected drum arrives with a crushed outer layer. For that reason the desk treats packing as part of the spec sheet. Each order gets a drum plan that lists every drum or pack with its construction, length, start and end metre marks, drum type, protection and gross and net weight, so that the buyer, the plant and the inspector work from the same list.

Drum and pack types

Common cable packing by line
PackTypical useNotes
Wooden drumLV, armoured, control and PV cable; fibre cableMost common export drum; fumigated or heat-treated wood as the destination requires
Steel-wood drumHeavier LV and armoured lengths, MV cableSteel flanges or frame with wooden barrel or battens; stiffer than all-wood
Steel drumLarge MV and heavy power cableHighest load; sometimes returnable by agreement
CoilBuilding wire, flexible cords, 100 m PV coilsShrink wrapped with label; palletised and stretch wrapped
305 m pull boxCat6, Cat6A and coaxBox or reel-in-box; gross about 13.5-14 kg for the Cat6 reference
Fibre drum, 2 km or 4 kmOutdoor, ADSS and indoor fibre cableBoth ends accessible for OTDR testing on arrival
Drop cable reel, 1 kmFTTH flat drop cableSmall plywood or plastic reel, often boxed

Wooden drums are made to order by drum makers near the plant, and their figure for making a batch is 2 to 4 weeks. That time runs in parallel with production but it has to be booked early, which is one reason drum type is fixed on the spec sheet rather than at loading. See box and reel packing for data cable.

How length per drum is set

The length that fits on a drum depends on two things: the cable's overall diameter, which sets how many metres fit in the drum's volume, and its weight per kilometre, which sets whether the drum can carry that length. Large diameter cable runs out of volume first; heavy cable runs out of load capacity first. The bending radius sets the smallest barrel the cable can be wound on. In practice the plant proposes a length per drum from its standard drum sizes and the desk checks it against the lengths your site needs, so that runs are pulled from a single drum where possible. The reference weights below, worked from the line pages, show how quickly the numbers grow.

Reference net cable weight per pack (cable only, drum excluded)
Reference constructionWeight per kmExample lengthNet cable weight
0.6/1 kV Cu/XLPE/PVC 4x25 mm2approx. 1,292 kg/km500 mapprox. 646 kg
0.6/1 kV Cu/XLPE/STA/PVC 4x35 mm2approx. 2,067 kg/km500 mapprox. 1,034 kg
0.6/1 kV Al/XLPE/PVC 4x95 mm2approx. 1,907 kg/km500 mapprox. 954 kg
8.7/15 kV Cu/XLPE/CTS/PVC 3x95 mm2approx. 5,403 kg/km500 mapprox. 2,702 kg
H1Z2Z2-K 1x4 mm255-66 kg/km500 m drumapprox. 28-33 kg
GYTS 24-core loose tube76-116 kg/km4 km drumapprox. 304-464 kg
GJXFH flat drop7.5-10.5 kg/km1 km reelapprox. 7.5-10.5 kg

These are catalogue or datasheet figures for the reference models, not weights of your order; the packing list carries the weighed gross and net figures per drum.

Lagging, end caps and protection

  • Lagging: wooden battens or boards nailed or banded across the flanges protect the outer layer from forklifts, lashing and other drums. It is the usual specification for power and armoured cable that travels by sea.
  • End caps: heat-shrink or push-on caps seal both cable ends against water; MV and fibre cable ends must be sealed.
  • Inner end access: for fibre and MV cable the inner end is brought out through the flange and protected, so it can be tested without unwinding.
  • Wrapping: plastic film under the lagging keeps dust and salt air off the sheath.
  • Marking: drum number, construction, length, metre marks, gross and net weight and a rolling direction arrow stencilled or tagged on the flange.

Damage to drums in transit is one of the most common claims on cable orders; drum damage prevention covers the failure modes.

How the desk checks packing

At pre-shipment inspection the inspector compares each drum with the drum plan: length by metre marks, construction by print, end caps, lagging, tag data and weight. Drums that do not match are corrected before they go to the container; loading itself is covered on logistics and shipping. Typical MOQ per size and how drum booking affects lead time are on MOQ and lead time, and the quote form accepts the run lengths your site needs.

Questions buyers ask

Q01How many metres fit on one drum?

It depends on the cable's diameter and weight per kilometre and on the drum sizes the plant uses. Heavy cable is limited by drum load, large cable by volume. The plant proposes a length per drum and the desk checks it against your run lengths on the drum plan.

Q02Should we choose wooden or steel drums?

Wooden drums suit most LV, armoured, PV and fibre cable. Steel-wood or steel drums suit heavier MV and large power cable or sites that handle drums repeatedly. The choice depends on weight, handling equipment and whether drums are returned; it is fixed on the spec sheet.

Q03Can we specify our own drum lengths?

Yes. Send the run lengths from your schedule and the desk asks the plant to cut to them where the drum capacity allows, with start and end metre marks recorded per drum. Cutting to many short lengths can add cost and time, which is shown on the quote.

Q04What packing do fibre cables use?

Outdoor and ADSS fibre cable is commonly packed on 2 km or 4 km wooden drums with both ends accessible for testing, and flat drop cable usually on 1 km reels. Exact lengths follow the datasheet and the order.

Q05Is lagging necessary?

For power and armoured cable shipped by sea it is the usual protection for the outer layer against forklifts, lashing and other drums. Light fibre drums and boxed cable may use film and cartons instead. The desk sets the protection on the drum plan.

RFQSend the construction or standard you need, cross-sections, total metres and drum lengths, the reports your market asks for and the destination port. The desk replies in writing with matched factories, a spec sheet and the reference MOQ.

Request a quote